Services › TNB Three-Phase Electricity

TNB Three-Phase Electricity Application Assistance

Licencore Advisory, based in Cheras, Selangor, helps business owners with the administrative side of applying for or upgrading to a three-phase electricity supply from TNB. We help you understand the process, organise the documents and coordinate the paperwork. The technical work is handled by qualified professionals such as your electrical contractor or electrical engineer, and TNB decides on the application.

Why businesses look into three-phase supply

Some businesses need more power than their current supply provides, for example a commercial kitchen with heavier equipment, a workshop with machinery, or premises with larger air-conditioning loads. Whether you need three-phase supply, and what is required, depends on your equipment and premises. It is worth checking this before renovation and equipment purchases are finalised, so the electrical work and the application can be planned together.

Who does what

  • TNB — receives the application, sets the technical requirements and any charges or deposits, and decides on approval.
  • Qualified professionals (electrical contractor / electrical engineer) — assess the load, carry out the wiring and prepare the technical documents.
  • Licencore Advisory — helps with the administrative process: understanding the steps, organising the application documents, coordinating between you and the parties involved, and following up.

What we do

01 Understand your premises and plans

The business, the premises, and the equipment you plan to use.

02 Map the process

What the application involves, who handles which part, and what documents are likely to be needed.

03 Prepare the documents

Organise the applicant and premises documents and collect the technical documents from your contractor.

04 Application support and follow-up

Who submits the application and which technical documents are needed depend on TNB’s current process. We explain the process first, help prepare the documents and follow up; the technical work is handled by a qualified electrical contractor.

05 Follow up on further requirements

Anything TNB asks for after the application.

What you may need to prepare

TNB’s current requirements apply. Typically, this involves the applicant’s and premises details (for example, SSM documents and tenancy or ownership documents) together with technical documents from your electrical contractor. If you are a tenant, talk to your landlord early about the electrical works.

A note on approval and charges

Approval, technical requirements, timing and any charges or deposits are decided by TNB. We don’t quote TNB charges or promise timelines.

Frequently Asked Questions

How do I know if my business needs three-phase power?

It depends on the equipment you plan to run and your premises. Your electrical contractor or engineer can assess the load. We help you understand the application process once that is clear.

Can Licencore do the electrical work?

No. The technical work and documents are handled by qualified professionals such as a registered electrical contractor or electrical engineer. We help with the administrative process and documents.

How much is the TNB 3 phase deposit or cost?

Charges and deposits are set by TNB and depend on the application. Please refer to TNB for current charges. We don’t quote amounts.

How long does a TNB three-phase application take?

TNB decides the process and timing. We help you prepare the documents and follow up so the administrative side is in order.

Can I upgrade from single-phase to three-phase at an existing shop?

Upgrades are possible through an application to TNB, subject to TNB’s technical requirements. Tell us about your premises and we’ll explain the steps involved.

Opening new premises? See Business Licence.

Scroll to Top